Enhanced interface
Delete a work in progress (WIP) schedule
You can delete a WIP schedule, even if it's been posted. If you delete a posted WIP schedule, the general ledger posting is reverted, and lines and data from the schedule are deleted.
WIP schedules created at the top level can only be edited and deleted from the top level.
Permissions and other requirements
| Subscription |
Construction Projects |
|---|---|
| Regional availability |
|
| User type |
Business Project Manager |
| Permissions |
Projects
|
- Go to Projects > All > WIP schedules.
- Find the WIP schedule.
- Select the More actions button (...) at the end of the row.
- Select Delete.