Create a work in progress (WIP) schedule
Permissions and other requirements
| Subscription |
Construction Projects |
|---|---|
| Regional availability |
|
| User type |
Business Project Manager |
| Permissions |
Projects
|
- Go to Projects > All > WIP schedules.
- Select Create.
- If you are at the top level, select an Entity.
- Select a Period name.
- The available options are based on the reporting periods that have been set up at the top level.
- Only periods that are included for Budget are in the list.
- If a reporting period is already in use for a WIP schedule, it's not available in the list.
After you select a reporting period as the period name, the projects that meet the WIP criteria during that period are listed in the WIP projects section. You can start editing the project information.
- Add a comment if needed.
- Select Save.
Next step: Edit the WIP schedule