Field descriptions: Define standard tasks

Define standard tasks field descriptions
Field Description
ID

Required.

You cannot change the standard task ID.

If your Projects application is configured for automatic document numbering, -New- appears in this field. Clicking Save automatically assigns after a new ID.

Your administrator may need to adjust your document sequence number configuration to make sure no duplicate task IDs are created. Go to the Configure Projects page to modify the document numbering sequence.

Name

Required. Enter up to 200 characters.

Description

Enter up to 1000 characters.

If your administrator configured Projects to re-purpose the Class dimension with Task and autofill the Class field with the Task Name, the Class Name field reflects the Task Description for added reporting visibility.

Status

Assigns a status to the task (such as in progress, completed, or on hold). 
You cannot apply timesheet entries to tasks marked as completed.

Priority

Lets you prioritize the task.

Parent ID

Allows you to create groups of standard tasks in the Standard Tasks Catalog, where the parent ID identifies the top level of the group. Sub-level tasks appear indented below the top level.

Class

This field appears if your company has associated the class dimension with tasks for GL tracking and financial reporting. Depending on configuration options:

  • Class is autofilled
    The class description reflects the task description in a display-only field.

  • Class is required
    You select the class from the dropdown set of options.

  • Class is optional
    You can enter a class, or leave the Class field empty.

    If the Class field is empty and you filter or report on the class dimension, this task isn't included in GL tracking or financial reporting.

Item

Item associated with this task. Required if task is billable.

Billable

To be able to bill the time entries to the client, select the Billable checkbox.

Clear the box if the time entries are not billable to the client.

Milestone

To use the completion of this task as a milestone, select the Milestone checkbox.

Utilized

A utilized task indicates progress on a customer project or internal project.

A non-utilized task indicates a task not working on a customer project or internal project, for example, time spent filling in an expense report or timesheet.

WBS code

Work breakdown structure (WBS)

Enter up to 8 characters.

Time type

Assign a time type (such as salary, contract hours, overtime, or vacation) to the task. Required if you set up to post labor costs to general ledger accounts.